Sign In | Join Free | My burrillandco.com
Home > Steel Frame Building Construction >

Custom Steel Frame Building For Activity Centers Fast Construction

Qingdao Yidongxiang Steel Structure Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Custom Steel Frame Building For Activity Centers Fast Construction from wholesalers
     
    Buy cheap Custom Steel Frame Building For Activity Centers Fast Construction from wholesalers
    • Buy cheap Custom Steel Frame Building For Activity Centers Fast Construction from wholesalers
    • Buy cheap Custom Steel Frame Building For Activity Centers Fast Construction from wholesalers
    • Buy cheap Custom Steel Frame Building For Activity Centers Fast Construction from wholesalers
    • Buy cheap Custom Steel Frame Building For Activity Centers Fast Construction from wholesalers
    • Buy cheap Custom Steel Frame Building For Activity Centers Fast Construction from wholesalers
    • Buy cheap Custom Steel Frame Building For Activity Centers Fast Construction from wholesalers

    Custom Steel Frame Building For Activity Centers Fast Construction

    Ask Lasest Price
    Brand Name : YDX
    Model Number : YDX-D4S
    Certification : CE ISO SGS
    Price : $30.00-$65.00
    Payment Terms : T/T
    Supply Ability : 10000 tons/month
    Delivery Time : 20-30 works days
    • Product Details
    • Company Profile

    Custom Steel Frame Building For Activity Centers Fast Construction

    Portal Steel Frame Structure Building For Activity Center

    Project Introduction:

    Welded H section steel beams and columns are connected by high strength bolts to be the main steel frame structure. Clean span that without center column could provide large space. Double row windows light up inside. Environmental epoxy floor coating has better dustproof property and makes the floor smooth. It also has a double storeys office building inside.

    Project Details:

    Steel structure building
    1. Primary FramingBox beam column, cross steel column, H-shaped steel column, steel beam
    2. Secondary FramingGalvanized Z and C sections purlin
    3. Roof and Wall panelsSteel sheet and insulated sandwich panels (EPS, fiberglass wool and PU).
    4. Steel Decking FloorGalvanized steel decking board
    5.Structural subsystemDivider, gutter, awning, partition wall
    6.Mezzanines, PlatformsPainted or galvanized H beam
    7.Other Building AccessoriesSliding doors, roll up doors, aluminium windows, louvers, etc.
    Service Life50-70yearssupportsteel angle, steel pipe, steel round
    Place of OriginQingdao,Shandong,ChinaApplicationworkshop, warehouse, poultry house,garage etc
    GradeQ235B, Q355B or as per customer's needBolt GradeM20, M16, M14 etc
    Connectionintensive bolt, ordinary boltWindowPVC steel or aluminum alloy
    DownspoutPVC pipe or as per customer's requestDoorsliding or rolling door
    PurlinC/Z shape profilePanelEPS/PU/fiber glass/rock wool
    Main FrameWelded or hot rolled H-shaped steel, columns, beams, box beams and columns
    Drawings & Quotation:
    (1) Customized design is welcomed.
    (2) In order to promise an accurate quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly.
    Product Application
    Light Frame Steel Construction Hangar Design Prefabricated Steel Structure Factory Building Workshop warehouse
    A pre-engineered steel building is a modern technology where the complete designing is done at the factory and the building components are brought to the site and then fixed/jointed at the site, all is bolt connection, no need any welding!
    An efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%. Lighter weight equates to less steel and potential price savings in structural framework.
    SPECIFICATION FOR STEEL STRUCTURE BUILDING
    Main Steel FrameSteel Column & Beam1. Material: Q345B (S355JR) or Q235B(S235JR)/ Welded/Hot Rolled H section steel
    2. Surface: Hot Dip Galvanized or Painted;
    3. Connection: All Bolts Connection;
    Supporting SystemRoof PurlinC or Z Section Steel, Q235B
    Wall PurlinC or Z Section Steel, Q235B
    BracingSteel Rod, Q235B
    Cross SupportSteel Rod, Q235B
    Column SupportAngle Steel; Steel Rod; Q235B
    Angle BraceAngle steel,Q235B
    Tie BarSteel Pipe,Q235B
    Roof & Wall System1. Single Colorful Corrugated Steel Sheet;
    Thickness: 0.3-0.8mm
    2. Sandwich Panel with EPS, Rock Wool, Fiberglass,PU;
    Thickness: 50-150mm;
    AccessoriesDoorSliding; Rolled Up Door (Manual/Auto)
    WindowAluminum Alloy; PVC;
    DownspoutPVC pipe;
    GutterGalvanized Steel Sheet; Stainless Steel
    VentilatorStainless Steel Turbine Ventilator
    Skylight BeltFRP or PC semi-transparent Skylight Belt
    FlashColor Steel Sheet
    FittingsAnchor Bolt; High Strength Bolt; Standard Bolt, Self-tapping nail etc

    Custom Steel Frame Building For Activity Centers Fast Construction

    Advantages of prefabricated steel structure buildings:

    1High strength and light weightAlthough the density of steel is larger than that of other building materials, its strength is very high. Under the same force, the steel structure has a small weight and can be made into a structure with a large span.
    2Good plasticity and good toughnessThe plasticity of the steel is good, and the structure will not suddenly break due to accidental overload or partial overload. The toughness of the steel is good, making the structure more adaptable to dynamic loads.
    3High degree of industrialization in productionThe steel structure is mainly produced in a specialized metal structure factory, so the production is simple and the precision is high.
    4Simple construction and short construction periodAll components are prefabricated at the factory, and the site is simply assembled, which greatly shortens the construction period.
    5Wind resistance and structural stabilitySteel structure construction with light weight, high strength, good overall rigidity and strong deformation ability
    6Saving construction costsThe steel structure has light weight, reduces the basic cost, and has a fast construction speed. It can be completed and put into operation as soon as possible, and the comprehensive economic benefits are much better than the concrete structure.
    7RecyclableSteel can be recycled, less environmentally polluted when constructed and removed

    Packaging and Transportation:

    Custom Steel Frame Building For Activity Centers Fast Construction

    The Customer Gave a High Praise:

    Custom Steel Frame Building For Activity Centers Fast Construction

    Quality Custom Steel Frame Building For Activity Centers Fast Construction for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Qingdao Yidongxiang Steel Structure Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)